炼钢厂钢包回转台快速整体吊装技术

Fast Integral Lifting Technology of Ladle Turret in Steel-melting Plant
下载PDF
导出
摘要 文章结合大包回转台吊装工程实践,介绍了使用双扁担梁实现钢包回转台整体快速吊装拆安的技术。文章主要阐述了拆安及吊装的准备事项吊装用扁担梁的结构形式以及人员、机具、材料的准备情况,该技术可供厂房内跨间重型设备拆安工程施工借鉴。 In this paper, the fast integral lifting, removing and installing technologies of ladle turret with double shoulder pole beam are introduced combining with the engineering practices of lifting turret. Moreover, it is mainly elaborated the preparation of lifting,removing and installing,the structure of shoulder pole beam used for lifting as wet1 as the preparation of personnel, machines and tools and materials. This technology could be as reference for the engineering of removing and in- stalling heavy equipment for span in plant.
作者 许晨阳 王平
出处 《包钢科技》 2013年第2期50-52,共3页 Science & Technology of Baotou Steel
关键词 扁担梁 重型设备 跨间吊装 shoulder pole beam heavy equipment span lifting
  • 相关文献

参考文献1

  • 1成大先.机械设计手册[M].北京:化学工业出版社,2004..

共引文献495

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部