阐述了入岩界定的基本方法,并以某嵌岩桩码头工程为例,对其量化指标进行了探讨与验证。结果表明:现场入岩界定受地质条件、施工工艺以及专业水平等诸多因素影响,但在小区域范围内进行量化,仍具有可行性。
The basic method of rock elevation determination was elaborated for the rock-embedded pile's installation and the quantitative criteria was analyzed and verified on the a rock-embedded pile wharf.Due to many uncertainties exist,such as geological conditions,construction techniques,as well as professional level,the results confirm the feasibility of the quantitative criteria for a signal project.
出处
《山西建筑》
2013年第13期77-79,共3页
Shanxi Architecture
关键词
花岗岩
嵌岩桩
码头
界定
granite
rock-embedded pile
dock
determination