摘要
以上海某工程为例,介绍了逆作法中一柱一桩垂直度控制技术,阐述了其工艺流程,并对激光倾斜仪测垂法和液压全自动调垂法的特点进行了总结,指出采用激光倾斜仪和自动化调垂仪相结合的新技术,提高了施工效率。
Taking the Shanghai engineering as an example,the paper introduces one-pile-one-column aligner control technology with inverted construction technology,describes its technological procedure,and summarizes the features of laser clinometer aligner and hydraulic automatic tuning method,and finally points out that the combination technology of laser clinometer and automatic aligner can improve construction efficiency.
出处
《山西建筑》
2013年第13期83-85,共3页
Shanxi Architecture
关键词
逆作法
激光倾斜仪
自动化调垂仪
施工工艺
inverted construction method
laser clinometer
automatic aligner
construction technology