摘要
结合具体工程实例,对土方工程和深基坑支护工程中容易出现的质量问题进行了详细的分析,并提出了相应的预控措施,指出在施工过程中应严格执行方案,严把质量关,从而确保施工质量和安全。
Combining with specific engineering examples,the paper analyzes easily occurring quality problems of earthwork and deep foundation support engineering,puts forward corresponding preventive measures,and points out some suggestions including strictly following scheme and strictly controlling quality in construction process,so as to ensure the construction quality and security.
出处
《山西建筑》
2013年第13期215-216,共2页
Shanxi Architecture
关键词
土方工程
湿陷性黄土
深基坑
土钉墙支护
earthwork
collapsible loose
deep foundation
soil nail wall support