摘要
针对吕望节制闸运行管理中出现的问题,提出了除险加固设计方案并进行了比选,介绍了具体的加固措施,消除了老闸运行中的安全隐患,以充分发挥其工程效益。
In view of Lvwang sluice problems arising from the operation and management, put forward the danger removing and strengthening de- sign program and have compared, concrete reinforcement measures, eliminated the security risks in the run of the old sluice, and gave full play to the engineering benefit.
出处
《山西建筑》
2013年第14期210-212,共3页
Shanxi Architecture
关键词
节制闸
除险加固
工程设计
sluice, danger removing and strengthening, engineering design