期刊文献+

基于k/N保障系统的连续施工设备配置优化分析

Optimal analysis of continuous construction equipment distribution based on k/N guarantee system
下载PDF
导出
摘要 通过分类讨论,数学建模,实例验证等方法对连续施工过程中备用设备保障量的确定方法进行了研究,对现场施工企业的工作具有一定实际指导意义。 This paper discuss the classification, mathematical modeling, validated the method to study the method of determining the amount of reserve protection equipment of continuous construction process, and has certain practical guiding significance on the field work for construction enterprises.
作者 刘云 李敏
出处 《山西建筑》 2013年第14期215-217,共3页 Shanxi Architecture
关键词 k N系统 连续施工 设备保障 k/N system, continuous construction, equipment protection
  • 相关文献

参考文献4

二级参考文献9

  • 1马绍民.综合保障工程[M].国防工业出版社,1995.12.
  • 2李建平 石全 等.装备战场抢修理论与应用[M].兵器工业出版社,2000..
  • 3Moubray J. Reliability-centred Maintenance [M]. Oxford: Butterworth-Heinemann,1997.
  • 4Blanchard B S. Logistics Engineering and Management [M]. Portland: Prentice Hall,1998.
  • 5Blanchard B S. A Key to Effective Serviceability and Maintenance Management [M]. Indianapolis: John Wiley & Sons, Inc,1994.
  • 6MIL-HDBK-217D, Reliability Prediction Electronic Equipment [S].1982.
  • 7MIL-HDBK-502, Acquisition Logistice [S].1997.
  • 8MIL-PRF-49506, Logistics Management Information [S].1996.
  • 9庄惜铁.工程机械的预知维修[J].筑路机械与施工机械化,2003,20(1):45-46. 被引量:9

共引文献30

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部