期刊文献+

钢筋混凝土烟囱温度应力计算方法

CALCULATION METHOD OF THE TEMPERATURE STRESS OF REINFORCED CONCRETE CHIMNEY
原文传递
导出
摘要 在钢筋混凝土烟囱筒身使用阶段的应力计算中,必须考虑温度应力。通过对GB 50051—2002《烟囱设计规范》(下称"规范")[1]关于使用阶段迎风侧竖向钢筋拉应力的数值分析与理论研究发现,在温度与外荷载(自重与风荷载)共同作用的情况下,规范的迎风侧钢筋拉应力计算公式存在不连续,为此,分析了造成不连续的原因,并且提出了改进的应力计算方法。 For the stress calculation of a reinforced concrete chimney under serviceability limit state, thermal stress must be considered. Based on the "Code for Design of Chimneys" (GB 50051--2002)[11 chereafter referred to as "standard"), it was found by the numerical analysis and theoretic study on vertical reinforcement tensile stress on windward side during service that under co-action of temperature and load ( weight and wind load) , there was a discontinuity in the tensile stress calculation formula in the code, therefore, the causes for the discontinuity were analyzed, and a modified calculation method of temperature stress was also proposed.
出处 《工业建筑》 CSCD 北大核心 2013年第4期82-85,共4页 Industrial Construction
关键词 烟囱 钢筋应变不均匀系数 钢筋拉应力 chimney non-uniformly distributed strain coefficient of reinforcement tensile stress of reinforcement
  • 相关文献

参考文献3

  • 1GB50051-2002.烟囱设计规范[S].[S].,..
  • 2方雪兰.钢筋混凝土烟囱温度应力简捷计算法[J].西安冶金建筑学院学报.1984(6).29.
  • 3朱彦鹏.特种结构[M].武汉:武汉理工大学出版社,2004.

共引文献68

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部