摘要
在集气站单井总机关安装时,为保证其外形尺寸及精度,本文详细论述了不同安装过程对总机关安装外形尺寸精度的影响,介绍了能改善和解决集气站单井总机关安装时,外形尺寸不好控制的问题。
When installing the single well total organs in gas gathering station, in order to ensure its dimensions and accuracy, this paer discusses the impact of different installation process on the dimensions accuracy of total organs, introduces the way to control the dimensions in the installation of single well total organs in gas gathering station.
出处
《价值工程》
2013年第14期127-128,共2页
Value Engineering