摘要
新疆与西北主网联网750千伏第二通道线路工程(第5标段)位于哈密地区戈壁滩,地形平坦,适合大规模采用吊车进行组立,根据塔高采取多种吨位的吊车组合进行铁塔组立,施工效率高,综合成本低,施工安全可靠,取得良好的效果。
The second channel (Lot.5) project of Xinjiang and the northwest main network interconneetion 750 kV line is located in the Gobi Desert of Hami region, and its terrain is flat, so it is suitable for using the large-scale crane assembly. The way of taking a variety of crane combination according to the height of tower to do tower assembly has achieved good results due to its high efficiency, low cost, safe and reliable construction.
出处
《价值工程》
2013年第14期132-133,共2页
Value Engineering
关键词
输电线路
吊车组合
立塔
施工
transmission lines
crane combination
vertical tower
construction