期刊文献+

基于集装箱任务组时间窗的堆场场桥调度模型建立与求解 被引量:6

Scheduling Yard Crane in a Block for Container Port Jobs Based on Time Window
下载PDF
导出
摘要 有效的场桥调度模型对于减少集卡等待时间从而增加集装箱码头的产出量是非常关键的.考虑实际操作中单场区内多台场桥同时工作、互有干扰以及存取箱同时操作等约束,建立了基于任务组时间窗的以集装箱作业时间延迟或提前量最小为目标的数学模型.采用Gurobi进行优化求解本模型求得大规模堆场上场桥作业调度问题.经实际算例计算发现所得结果与实际相符.该模型在解决集装箱码头大规模问题中以及在获取解的质量与获取解所需时间上都优异于其他模型. Efficient yard crane scheduling to decrease the trucks' waiting time is a key in increasing a CT'sthroughput. We promote an efficient model for Yard crane Scheduling Problem 〈YCSP) in a block with some realistic operational constraints such as inter-crane interference and simultaneous container storage/retrievals, using 0-1 decision variables. Using Gurobi based on C# environment, the model yields are close to optimal solutions in seconds. The solution quality and solution time are both better than the ones which have same constraints considered in literature.
出处 《河南科学》 2013年第4期477-483,共7页 Henan Science
基金 国家自然科学基金(71071093) 上海市自然科学基金(10ZR1413300) 上海市教委创新基金(11YZ136) 上海市科委创新项目(09DZ2250400 9530708200 10190502500) 上海市重点学科(J 50604)
关键词 集装箱任务组 时间窗 场桥调度 混合整数规划 container moves: time window YCSP MIP
  • 相关文献

参考文献10

  • 1黄竞.国际集装箱运输市场回顾与展望[J].世界海运,2011,34(3):10-13. 被引量:2
  • 2Ng W C,Mak K L. Yard crane scheduling in port container terminals [J]. Applied Mathematical Modelling, 2005 (29) : 263-275.
  • 3Ng W C. Mak K L,Tsang W S. Scheduling yard crane in a port container terminal using genetic algorithm [j]. International Journalof Industrial Engineering, 2006,13: 246-253.
  • 4Kim K H. Lee K M, Hwang H. Sequencing delivery and receiving operations for yard cranes in port container terminals [J].International Journal of Production Economics,2003,84 (3) : 283—292.
  • 5Ng W C. Crane scheduling in container yards with inter—crane interference[J].European Journal of Operational Research.2005.164(1):64-78.
  • 6Li W, Wu Y,Petering M E H, et al. Discrete time model and algorithms for container yard crane scheduling [j]. European Journalof Operational Research,2009,198(1) : 165-172.
  • 7Mak K L,Sun D. A new hybrid genetic algorithm and tabu search method for yard cranes scheduling with inter-crane interference [C]//Proceedings of the World Congress on Engineering. London, U.K.: WCE, 2009.
  • 8Javanshir H,Seyedalizadeh Ganji S R. Yard crane scheduling in port container terminals using genetic algorithm Q]. Journal ofIndustrial Engineering International,2010,6(11):39-50.
  • 9韩晓龙.集装箱港口龙门吊的最优路径问题[J].上海海事大学学报,2005,26(2):39-41. 被引量:24
  • 10严伟,宓为建,苌道方,何军良.一种基于最佳优先搜索算法的集装箱堆场场桥调度策略[J].中国工程机械学报,2008,6(1):95-100. 被引量:11

二级参考文献5

  • 1杨静蕾.集装箱码头物流路径优化研究[J].水运工程,2006(1):32-35. 被引量:38
  • 2NARASIMHAN A. Analysis and algorithm for transtainer routing problem in container port operation [ J ]. Transportation Science,2002,36 (1): 63 -78.
  • 3马振华.现代应用数学手册--运筹学与最优化理论卷[M].北京:清华大学出版社,1998..
  • 4CHUNG Y G, RANDHAWA S U, MCDOWELL E D. A simulation analysis for a transtainer-based container handling facility [ J ].Computers and Industrial Engineering, 1985, 14 ( 2 ): 113 - 125.
  • 5KAP H K. An optimal routing algorithm for a transfer crane in port container terminals [ J ]. Transportation Science , 1999,33 ( 1 ): 17-33.

共引文献32

同被引文献42

  • 1韩晓龙.集装箱港口龙门吊的最优路径问题[J].上海海事大学学报,2005,26(2):39-41. 被引量:24
  • 2Kim K H,Park Y M.A crane scheduling method for port container ter- minals[J].European Journal of Operational Research,2004,156:752- 768.
  • 3Lim A,Rodrigues B,Xiao F,Zhu Y.Crane scheduling with spatial con- straints[J].Naval Research Logistics,2004,51:386-406.
  • 4Liang C J,Huang Y F,Yang Y.A quay crane dynamic scheduling prob- lem by hybrid evolutionary algorithm for berth allocation planning[J]. Computers & Industrial Engineering,2009,56(3):l 021-1 028.
  • 5Bish E K,Leong T Y,Li C L,Ng J W C,Simchi-Levi D.Analysis of a new vehicle scheduling and location problem[J].Naval Research Logis- tics,2001,(48):363-385.
  • 6Pyung Hoi Koo.Fleet sizing and routing for container transportation in a static environment[J].OR Spectrum,2004,26:193-209.
  • 7Legato P,Canonaco P,Mazza R M.Gantry crane management by simu- lation and optimisation[J].Maritime Economics & Logistics,2009,11(1): 36-57.
  • 8Cao J X,Shi Q X,Lee D H.Integrated Quay Crane and Yard Truck Schedule Problem in Container Terminal[J].Tsinghua Seience and Technology ,2010,15 (4):467 -474.
  • 9Cao J X,Lee D H,Chen J H,Shi Q.The integrated yard truck and gantry crane scheduling problem:Bender' decomposition-based methods[J]. Transportation Research Part E,2010,46:344-353.
  • 10何军良,宓为建,严伟.基于爬山算法的集装箱堆场场桥调度[J].上海海事大学学报,2007,28(4):11-15. 被引量:15

引证文献6

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部