摘要 金川二矿区为我国特大型地下矿山,采用机械化盘区下向进路胶结充填采矿。二矿区连续开采面积大、年出矿量大,加上矿山工程地质条件较差,地应力大等原因,使得地压问题突出。详细介绍了二矿区大范围地压监测的基本方案、测点布置方式及其典型的测点布置图、采用的监测方法和仪器设备等;在针对围岩体应力、位移等现有监测数据的基础上,初步分析了个监测点的数据变化与发展趋势,针对二矿区大面积开采和水平矿柱开采过程中对14行回风井、大范围上下盘围岩体的影响进行了分析与初步评价,并得到了一些对安全生产有指导和参考价值的初步结果。 Jinchuan No. 2 mine area is an extra large underground mine in China. The underhand drift cemented cut and fill stoping with mechanized panel is adopted. The Jinchuan No. 2 mine has large continuous exploit area and large an- nual output of ore. Additively, due to the relatively poor engineering geological conditions,large stress and other reasons, the ground pressure problem becomes more serious. This paper introduces the basic pressure monitoring program in No. 2 Mine Area, the arrangement of the measuring point and its typical layout, monitoring methods and equipment etc. ; Based on the existing monitoring data of rock mass stress and displacement, the data varies and its trends of the monitoring points are ana- lyzed preliminarily. During the exploitation process of large mining area and level pillars, the influence to the rocks at Line No. 14 air shaft and wide range of upper and lower panel are analyzed and evaluated, obtaining some achievements which play some guidance and reference value in safety production.
出处 《金属矿山》 CAS 北大核心 2013年第4期15-18,共4页 Metal Mine
关键词 大体积充填体 水平矿柱 地压监测 采动影响 Bulky filling, Level pillars, Ground pressure monitoring, Mining influence
  • 相关文献

参考文献7

二级参考文献40

共引文献58

同被引文献46

引证文献7

二级引证文献34

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部