以尼日利亚900 mm冷连轧生产线安装调试阶段现场管理实践为例,介绍海外冶金工程项目管理中常见问题及解决方法,指出今后在类似国家或地区开展冶金工程项目时应注意的事项。
Taking the management of the erection and connnissioning of 900 mm tandem cold mill in Nigeria job site as one example, the paper presents the Common problenas occurred in the management of oversea metallurgical engineering project and offers the solution, meantime, points out the matters need attention for the management of oversea metallurgical engineering project in analog oversea nation and region for the future
出处
《一重技术》
2013年第2期70-72,共3页
CFHI Technology
关键词
国外
冶金工程项目
现场管理
oversea
metallurgical engineering project
managemenl on job site