摘要
简介盐田港二期码头人锚定施工,通过试验分析,比较了多根锚杆的最小锚固长度和嵌岩桩内锚定与非嵌岩桩桩内锚定的主要区别,并对直径较小的嵌岩桩锚定提出和全嵌岩替代的建议。
It introduces the anchorage construction technique of pile for the2nd-phase project Yantian Port. Based on the analysis of typical test result and comparison of the minimum anchorage length of many anchoring rods, as well as comparison of the main differences of inner anchored embedded pile and non embedded pile, it advances a suggestion that to replace inner-anchorage of embedded piles of smaller diameter with all rock-embedding.
作者
陈永恺
CHEN Yong-kai(The Second Company of the Fourth Navigation Engineering Bureau Under CHEC, Shenzhen 518003, China)
出处
《水运工程》
北大核心
2000年第8期35-40,共6页
Port & Waterway Engineering