摘要
通过对顶进框架桥的施工组织介绍,对比了顶进框架桥的概算编制,并分析出其工程造价的偏差原因,从而阐述了全面掌握施工组织对正确编制概算的重要性。
By means of introducing construction organization of jacking frame bridge, having estimate making of jacking frame bridge compared and deviation reasons of its engineering cost analyzed, thus the importance of fully mastering construction organization on correct estimate making has been explained.
出处
《铁路工程造价管理》
2000年第4期27-28,30,共3页
Railway Engineering Cost Management