异形宽尾墩挑流消能断面模型试验研究 被引量:1

Study on Irregular-Shaped Flaring Gate Pier Flip Trajectory Bucket Dissipation Cross-Section Model Test
下载PDF
导出
摘要 在中高水头、大流量和低弗劳得数等特性的工程中,下游消能防冲问题难以用常规传统单一的消能工来解决,近年来采用复合新型消能工已成为一种趋势。本文提及的工程正是采用异形宽尾墩与挑流联合消能来解决消能防冲问题的。本文以水工断面模型试验为基础,通过动床冲刷数据,对各异形宽尾墩的体型进行比较,提出了消能防冲最优的异形宽尾墩型式和具体尺寸,可为设计部门提供有力的依据。 Downstream energy dissipation erosion protection can not be easily solved by conventional and traditional single energy dissipator in the project with medium and high water head, large flow, low Froude and other features. The use of composite new energy dissipator has become a trend in recent years. The project mentioned in this article solves the energy dissipation erosion protection problem through adopting irregular-shaped flaring gate pier and deflecting combined energy dissipation. The paper is based on hydraulic cross-section model test. The shapes of all irregular-shaped flaring gate piers are compared through moving bed scouring data. Optimal irregular-shaped flaring gate pier forms and concrete sizes of energy dissipation erosion protection are proposed, thereby providing strong basis for design department.
出处 《中国水能及电气化》 2013年第4期16-19,共4页 China Water Power & Electrification
关键词 水工模型试验 异形宽尾墩 挑流消能 hydraulic model test irregular-shaped flaring gate pier flip trajectory bucket
  • 相关文献

参考文献3

二级参考文献7

  • 1倪汉根,白石水库溢流坝挑流消能试验研究报告,1996年
  • 2夏镜如,泄水工程与高速水流,1990年,2期
  • 3陈椿庭,高坝大流量泄洪建筑物,1988年,9页
  • 4刘树坤,水利水电科学研究院科学研究论文集.13,1983年
  • 5武汉水利电力学院水力学教研室,水力计算手册,1980年,12页
  • 6王均星,尹浩,刘金秀,杜泽金.龙开口水电站的泄洪消能防冲试验[J].武汉大学学报(工学版),2008,41(1):27-30. 被引量:6
  • 7倪汉根.宽尾墩—消力池的简化计算方法[J].水利学报,1998,29(6):19-24. 被引量:18

共引文献16

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部