期刊文献+

连城县大石岩水库电站增效扩容改造效果分析

Analysis of Synergy and Extension Renovation Effect of Liancheng County Dashiyan Reservoir Power Plant
下载PDF
导出
摘要 连城县大石岩水库电站增效扩容改造工程,是列入福建省"十二五"期间小水电增效扩容改造试点建设的项目之一。工程包括拆除老化病险厂房,在原址新建增效扩容后的新厂房,更新水轮发电机组,配置电站运行监控人、监测设备以及电气一、二次设备改造等项目建设。该工程建设完成后,经过一年多的运行,取得了显著的经济效益和社会效益。 The Efficiency Increase and Volume Expansion Renovation Project of Liancheng County Dashiyan Reservoir Power Plant is listed into one of the small hydropower efficiency increase and volume expansion renovation pilot construction projects of Fujian Province during the "12th Five-Year" period. The project includes disassembly of aging and dilapidated plants, new construction of new plant after efficiency increase and volume expansion on the original site, updating of turbine generator set, configuration of power plant operation monitoring personnel and monitoring equipment, modification of electrical primary and secondary equipment, and other project construction. After the project construction is completed, the project has achieved significant economic and social benefits after operation for more than one year.
作者 张达斌
出处 《中国水能及电气化》 2013年第4期52-54,共3页 China Water Power & Electrification
关键词 水库电站 增效扩容改造 效果分析 Reservoir power plant efficiency increase and volume expansion renovation effect analysis
  • 相关文献

参考文献2

  • 1扬州水利学校.电工与电气设备[M].北京:水利电力社出版1979.
  • 2成都水力发电学校.水电站[M].北京:水利电力社出版1979.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部