摘要
介绍了蓟县新城一期工程中新开么河(公乐亭湿地—蓟州湖段)的河道现状及规划,同时详细介绍了该工程的设计和计算过程,包括方案设计、初步设计和施工图设计。
This article introduced the present situation and planning of Xinkaiyao River(Gongleting Wetland ~ Jizhou Lake) in Jixian New Town Phase I Project,and also introduced the design and calculation of this project in detail including the scheme design,preliminary design and working drawing design.