某电厂燃机基座一期工程桩基过密造成施工困难,通过有限元ANSYS程序建模对基座进行动力分析,发现调整底板桩基数量对基座上部结构的动力响应影响不大,因此可在满足沉降和强度前提下,通过减少桩基数量来方便施工和降低造价。
Aiming at over dense pile foundations of phase- i project of gas-turbine pedestals that brings diffi- culties to construction work, the paper makes dynamic analysis on pedestals by ANSYS modeling. It is discov- ered that it has less impact on dynamic response of upper structure of pedestal to adjust quantity of pile foun- dations at the base board. Therefore, the pile foundations can be reduced on the premise that settlement and strength can be ensured to facilitate construction work and reduce the cost.
出处
《浙江电力》
2013年第4期68-72,共5页
Zhejiang Electric Power
关键词
燃机基座
桩基
动力分析
gas-turbine pedestal
pile foundation
dynamic analysis