期刊文献+

夹江大桥非机动车道桥设计与分析 被引量:3

Design and Analysis of Non-motor Vehicle Lane Bridge of Jiajiang Bridge
下载PDF
导出
摘要 依托南京夹江大桥非机动车道桥工程实例,对桥梁平面线位设计中所要考虑的因素进行分析与讨论;根据江心洲非机动车以电动自行车为主要车流的实际情况,对规范中关于非机动车最大限制纵坡进行了分析与研究;桥梁新老结构搭接遇到的反压支架进行论述,对设计和施工中需要注意的问题进行了探讨。 Based on the project instance of non-motor vehicle lane bridge of Jiajiang Bridge,the article analyzes and discusses the considered factors in the design of planar line of bridge.According to the actual situation that electric bicycles is the major traffic flow of non-motor vehicle,the article analyzes and researches the maximum limited longitudinal slope of non-motor vehicle required in the code.The article discusses the backpressure bracket occurred in lapping of the new and old bridge structures,and further discusses the problems for attention in the design and construction.
出处 《城市道桥与防洪》 2013年第4期82-84,10,共3页 Urban Roads Bridges & Flood Control
关键词 非机动车道桥 平面线位比选 限制坡度 反压支架 non-motor vehicle lane bridge,comparison and selection of planar line,limitations of longitudinal slope,backpressure bracket
  • 相关文献

参考文献4

二级参考文献7

  • 1JTGD40-2002.公路水泥混凝土路面设计规范[S].[S].,..
  • 2CJJ37-90.城市道路设计规范[S].[S].,..
  • 3JTG D20-2006,公路路线设计规范[S].
  • 4GB5017--2003,地铁设计规范[S].
  • 5铁道第二勘察设计院.国道205线深圳段改建工程可行性研究报告[R].成都:铁道第二勘察设计院,2005.
  • 6深圳市规划局,深圳市城市交通研究中心.深惠路(深圳段)改造规划方案[Z].深圳:深圳市规划局,深圳市城市交通研究中心,2005.
  • 7张磊.国道改建工程与地铁工程一体化勘察设计研究[J].铁道工程学报,2010,27(4):82-86. 被引量:2

共引文献7

同被引文献11

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部