摘要 本文根据三峡水库蓄水运用以来实测水文、河道地形观测资料,对三峡水库进出库水沙变化和泥沙淤积特性进行了较为系统地分析,并将实测结果与三峡工程初步设计阶段、"九五"、"十五"攻关阶段的计算结果进行了对比,结果表明:2003年6月~2010年12月,三峡入库悬移质泥沙15.801亿t,出库悬移质泥沙4.118亿t,水库淤积泥沙11.683亿t。从淤积强度沿程分布来看,随着坝前水位的逐渐抬高,泥沙淤积呈上延趋势。从横向分布来看,泥沙淤积主要集中在主槽。从纵向分布来看,库区干流泥沙淤积以宽谷段(平均库区水面宽大于600m)为主,占全河段总淤积量的97.4%,窄深段淤积相对较少或略有冲刷。不同阶段水科院和长科院研究成果均表明,在三峡水库运用前10年大坝至丰都河段河床淤积最明显,由于各计算方案所采用的入库水文边界条件与蓄水运用后的实测水沙过程有一定的差别,引起各阶段研究库区年均淤积量较实测值偏大、近坝段的淤积强度较实测值偏小以及水库排沙比偏大等情况出现,但淤积量的沿程分布特性与实测值吻合较好。 This paper presents a systematic analysis of the flow and sediment variations and the sediment deposition in the Three Gorges reservoir(TGR) using the measured hydrologic and topographic data.This analysis indicates that from Jun.2003 to Dec.2010,the total inflow of suspended load was 1.58 billion tons,the total outflow 0.41 billion tons,and the sediment deposition 1.17 billion tons.In terms of its longitudinal distribution along the river,the deposition took a trend of gradually extending upstream as the water level at the dam was raised up.The deposition volume in the wide valley reaches of water surface wider than 600m accounted for 97.4% of the total,while the deposition in the other reaches was little or a slight scour appeared.As for its transverse distribution,the deposition was concentrated on the main channel.The results for different operation stages of TGR reveals that in the first 10 years of impoundment,the deposition in the reach from Fengdu to the dam was the most significant.Since the boundary conditions used by the numerical model for the impoundment stage were somewhat different from the measured ones,however,a difference existed between the predictions and measurements.A comparison shows that the predicted total deposition in the reservoir was larger,and the predicted deposition intensity near the dam and the predicted sediment diversion ratio were less than the measured values.Nevertheless,the predicted pattern of deposition distribution agreed with the measurements.
出处 《水力发电学报》 EI CSCD 北大核心 2013年第2期139-145,174,共8页 Journal of Hydroelectric Engineering
基金 国家重点基础研究发展计划(973)资助(2012CB417001) 国家自然科学基金(51009109) 水利部公益性行业科研专项(200901003)
关键词 泥沙动力学 泥沙淤积 计算分析 三峡水库 排沙比 sediment dynamics sediment deposition calculation and analysis Three Gorges reservoir sediment diversion ratio
  • 相关文献

参考文献6

  • 1Bennett S J,Cooper C M, Ritchie J C,et al. Assessing sedimentation issues within aging flood control reservoirs in oklhoma [ J].Journal of the American Water Reources Association. 2002. 38(5) :1307-1322.
  • 2姜乃森,傅玲燕.中国的水库泥沙淤积问题[J].湖泊科学,1997,9(1):1-8. 被引量:38
  • 3许全喜.长江上游河流输沙规律变化及其影响因素研究[D].武汉大学博士学位论文,2006.
  • 4许全喜,张小峰,袁晶.长江上游河流输沙量时间序列跃变现象研究[J].长江流域资源与环境,2009,18(6):555-562. 被引量:7
  • 5国务院三峡工程建设委员会办公室泥沙专家组,中国长江三峡工程开发总公司三峡工程泥沙专家组,长江三峡工程泥沙问题研究第五卷[M].知识产权出版社,2002.
  • 6国务院三峡工程建设委员会办公室泥沙专家组,中国长江三峡工程开发总公司三峡工程泥沙专家组,长江三峡工程泥沙问题研究第二卷[M].知识产权出版社,2008.

二级参考文献13

共引文献42

同被引文献196

引证文献23

二级引证文献134

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部