摘要
编制环境影响报告表是环境影响评价工作的基础。讨论了编制建设项目环境影响报告表3个阶段(准备阶段,编制阶段、修改完善阶段)的工作方法。提出了各阶段的工作要点和编制过程中一些容易出现的问题及其解决方法。
To draw up environmental impact reporting forms (EIRFs)is the basis of the environmental impact assessment (EIA) process. Three working stages in the course of preparing the EIRF for a construction project, i.e. the set-up stage, drafting stage, and revising and finalising stage, were presented. Key points, likely encountered problems and solving ways in the course of each working stage were summadsed.
出处
《上海环境科学》
CAS
2013年第2期90-92,共3页
Shanghai Environmental Sciences
关键词
建设项目
环境影响评价
报告表
Construction project Environmental impact assessment (EIA)Environmental impact reporting form (EIRF)