摘要
沐若水电站位于马来西亚热带季风气候区。工程所在区域具有降雨量大、年际变化小、降雨与热带辐合带和季风有关等特点。为了向沐若水电站工程设计提供水文资料,根据电站所在流域的水文、气象资料,对流域内的气候、降水、径流、暴雨洪水、泥沙等特性进行了分析,得到了坝址设计洪水过程和不同频率的最大洪水,以及泥沙输移量及分布特点。与当地其他水利工程的水文分析成果对比表明,所得结果合理可靠。
Murum Hydropower Station is located in the tropical monsoon area of Malaysia with the characteristics of large pre- cipitation amount, small inter - year precipitation variation, and the precipitation is related with intertropical convergence zone and monsoon. In order to provide hydrological data for the design of the station, based on the hydro - meteorological data in the basin, the characteristics of climate, precipitation, runoff, rainstorm flood, sediment, etc. are analyzed and the design flood hy- drograph, the maximum flood of different frequencies at dam site, the transport amount and distribution of sediment are obtained. The comparison of the obtained results with analysis results of other local hydropower projects verifies the rationality and reliability of the obtained results.
出处
《人民长江》
北大核心
2013年第8期9-12,共4页
Yangtze River
关键词
热带季风区
降雨分析
洪水分析
泥沙分析
沐若水电站
tropical monsoon region
precipitation analysis
flood analysis
sediment analysis
Murum Hydropower Station