摘要
通过对良山铁矿边缘及中深部矿体研究,采用计算机三维可视化建模技术及深部钻模绳索取芯技术,在良山—流元段中深部危机矿山接替资源找矿工程中取得显著成果。
The technology of computer 3D visualization modeling and center and deep drilling jig rope coring are adapted based on the deep research on edge and deep ore body in Liangshan Iron ore. Great achievement for crisis mine replacement resources are obtained at center and deep part of Liangshan one stream section.
出处
《江西冶金》
2013年第2期4-7,共4页
Jiangxi Metallurgy
关键词
危机矿山
资源接替
勘查
找矿
crisis mines
resources replacement
exploration
prospecting ore