摘要
建立风险评价指标体系的基础上,运用控制区间和记忆(CIM)模型,辅以层次分析法,建立建设项目全寿命周期成本(LCC)风险评估模型.选用层次分析法确定建设项目LCC在各阶段的风险权重,运用控制区间和记忆模型计算各阶段次级风险因素的概率分布,对建设项目全寿命周期成本风险做出预测和评价.工程实例分析表明:项目风险集中在较低和低风险层次,低风险的可能性最大;设计阶段风险适中的概率较大,而其余阶段都集中于低风险层次.
Based on building risk evaluation index system, controlled interval and memory (CIM) models and analytical hierarchy process, the life cycle cost (LCC) risk evaluation model was established. The analytical hierarchy process was adopted to determine the weight coefficient of each stage, probability distribution of secondary risk factors in each stage was calculated via CIM, then LCC risk of construction project can be predicted and evaluated. An engineering case analysis shows that project risk focuses on the lower risk level and the low risk level, the low risk probability is maximum; the risk probability is medium in design stage, the risk probability is low in other stages.
出处
《华侨大学学报(自然科学版)》
CAS
北大核心
2013年第3期329-333,共5页
Journal of Huaqiao University(Natural Science)
基金
中央高校基本科研业务费专项资金资助项目
国家自然科学基金培育计划专项资助项目(JB-ZR1162)
华侨大学高层次人才科研启动项目(12BS131)
关键词
风险评估
建设项目
全寿命周期成本
控制区间和记忆模型
层次分析法
risk evaluation
construction project
life cycle cost
controlled interval and memory models
analytical hier-archy process