期刊文献+

动态空间调度的混合遗传算法 被引量:8

A Dynamic Spatial Scheduling Approach Based on Hybrid Genetic Algorithm
下载PDF
导出
摘要 提出了一种基于混合遗传算法的动态空间调度方法。首先利用遗传算法产生多个可行的分段调度序列,再采用动态决定分段位置的启发式算法——平均最大空闲矩形策略对遗传算法产生的调度序列进行解码。同时以完工时间和平台利用率的加权和作为适应度函数,充分考虑了空间调度问题所特有的动态性和时空关联性。遗传进化过程收敛后得到近似最优解,实现了调度方案的全局优化。对船厂实际生产数据进行了实证分析以及与其它算法的对比分析,证明了所提方法在空间调度问题上的有效性和实用性。 In this paper we propose a dynamic spatial scheduling approach based on hybrid genetic algorithm(GA).GA is used to determine the optimal processing sequence.In the process of decoding,the location of work pieces is determined by a dynamic heuristic location strategy,called an average maximized idle rectangle strategy.We use the weighted completion time and space utilization as the fitness function,which fully considers the dynamic nature and the correlation between time and space in a space schedule problem.Every individual in population is a scheduling sequence,and the optimal solution can be found in the process of evolution.Finally,the effectiveness and the practicability of the algorithm are confirmed by both a simulation study and empirical comparative study based on the actual data of a shipyard.
出处 《运筹与管理》 CSSCI CSCD 北大核心 2013年第2期99-104,共6页 Operations Research and Management Science
基金 国家自然科学基金资助项目(70871057 71171100 70971056)
关键词 运筹学 动态空间调度 遗传算法 启发式定位策略 operations research dynamic spatial scheduling genetic algorithm heuristic location strategy
  • 相关文献

参考文献14

  • 1Lee K J, Lee J K, Choi S Y. A Spatial Scheduling System and its Application to Shipbuilding: DAS-CURVE[ J]. Expert Sys- tem with Application, 1996, 10(3):311-324.
  • 2Lee K J, Lee J K, Park K H. Developing scheduling systems for daewoo shipbuilding: DAS project[ J]. European Journal of Operational Research, 1997, 97(2): 380-395.
  • 3Park K, Lee K, Park S. Modeling and solving the spatial block scheduling problem in a shipbuilding company[ J]. Computer Industrial Engineering, 1996, 30(3) : 357-364.
  • 4郭美娜,李波.基于树搜索的一种动态空间调度方法[J].计算机工程与应用,2007,43(14):180-183. 被引量:11
  • 5张志英,马姗静.基于综合分解策略的船体分段空间调度方法[J].机械工程学报,2010,46(22):189-194. 被引量:7
  • 6Cho K K, Lee D, Oum T H. An intelligent spatial planning and scheduling system[ C ]. roceedings of the 6th Annual International Conference on Industrial Engineering-teory, Application and Practice. San Francisco, CA, USA, 2001, November 18-20.
  • 7Raj P. Solving spatial scheduling problem: an analytical approach[ C ]. Proceeding of the 37th International Conference on Computers and Industrial Engineering. Alexandria, Egypt, 2007. 2002-2011.
  • 8张志英,陈洁.空间调度问题的非线性规划分析求解方法[J].计算机集成制造系统,2010,16(6):1272-1278. 被引量:7
  • 9Varghese R J, Yoon D Y. Dynamic spatial block arrangement scheduling in shipbuilding industry using genetic algorithm[ C ]. Third IEEE International Conference on Industrial informatics, India, 2005. 444-449.
  • 10Li B, Zhao Z Y, Li G. A Dynamic scheduling metheod for spatial layout planning[ C]. Proceedings of the 4th International Conference on Machine Learning and Cybernetics, Guangzhou, August 18-21, 2005.

二级参考文献41

共引文献25

同被引文献59

  • 1马英,左春荣,杨善林.带不可用时间段和恶化加工时间的单机调度[J].系统工程学报,2010,25(3):371-378. 被引量:5
  • 2刘胡瑶,何援军.基于轨迹计算的临界多边形求解算法[J].计算机辅助设计与图形学学报,2006,18(8):1123-1129. 被引量:12
  • 3刘振元,王红卫.基于优先规则的活动成本目标资源受限工程调度[J].系统工程理论与实践,2006,26(9):99-106. 被引量:10
  • 4郭美娜,李波.基于树搜索的一种动态空间调度方法[J].计算机工程与应用,2007,43(14):180-183. 被引量:11
  • 5Lee K J, Lee J K, Choi S Y. A Spatial SchedulingSystem and Its Application to Shipbuilding: DAS-CURVE [J]. Expert Systems with Applications,1996,10(3):311-324.
  • 6Lee J K,Lee K J, Park H K, et al. DevelopingScheduling Systems for Daewoo Shipbuilding: DASProject [J European Journal of Operational Re-search, 1997,97(2) : 380-395.
  • 7Koh S,Eom C. Jang J, et al. An Improved SpatialScheduling Algorithm for Block Assembly Shop inShipbuilding Company[C]//The 3rd InternationalConference on Innovative Computing Informationand Control. Dalian:IEEE, 2008:253-256.
  • 8Li Bo,Zhao Zhiyan, Li Gang. A Dynamic SchedulingMethod for Spatial Layout Planning[C]//Proceed-ings of the 4th International Conference on MachineLearning and Cybernetics. Guangzhou: IEEE, 2005 :18-21.
  • 9Li Lin,Jiang Zhibin. Self-adaptive Dynamic Schedu-ling of Virtual Production Systems[J], InternationalJournal of Production Research, 2007, 45 ( 9) : 1937-1951.
  • 10Cha J H,Roh M. Combined Discrete Event andDiscrete Time Simulation Framework and Its Ap-plication to the Block Erection Process in Ship-building [J ]. Advances in Engineering Software,2010,41:656-665.

引证文献8

二级引证文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部