某厂前区食堂采暖系统的运行现状分析 被引量:1

Analysis on Operation Status Quo of Heating System of Canteen in a Plant Administrative Area
下载PDF
导出
摘要 某热水采暖系统实际运行过程中出现了较为严重的水力失调问题,在根据现场情况进行一定调试的基础上,分析了产生问题的原因,并对提出的3种改造方案进行比选,最终选择增设供水干管并设闸阀的办法,减小系统管路的阻力及不平衡性,从而解决了采暖系统水力失调问题。 Serious hydraulic imbalance problem is incurred in actual operation of a hot water heating system, on a basis of adjustment of site condition, the paper analyzes causes that the problem is incurred, and three proposed modification schemes are compared and selected, finally, it selected that new water supply main pipe is added and gate valve is mounted, resistance and unbalance of system pipeline arc reduced so as to settle hydraulic imbalance problem of heating system.
作者 赵菊恒
出处 《有色冶金设计与研究》 2013年第2期24-26,共3页 Nonferrous Metals Engineering & Research
关键词 热水采暖 上供上回系统 水力失调 hot water heating upper supply and upper return system hydraulic imbalance
  • 相关文献

参考文献1

  • 1GB50016,采暖通风与空调设计规范[S].

同被引文献3

  • 1重有色冶金企业供暖通风设计参考资料编写组.重有色冶金企业采暖通风设计参考资料[M].北京:冶金工业出版社,1980.
  • 2GB50016-2003.采暖通风与空调设计规范[S].
  • 3陆耀庆.实用供热设计手册[M].上册.北京:中国建筑工业出版社,2008.