南京长江二桥南汊桥主塔基础钢围堰施工测量 被引量:2

The Steel Cofferdam Construction Surveying of the Main Tower's Foundation of the South Branch of NO.2 Yangtze River Bridge of Nanjing
下载PDF
导出
摘要 对大型斜拉桥主塔基础钢围堰的制作、拼装、定位及下沉的施工测量作了全面论述。包括大型双壁钢围堰的底节制作、拼装接高、基准面传递、精密定位着床、吸泥下沉至着岩、清基及竣工测量。旨在为大型斜拉桥建设提供可行的主塔基础钢围堰施测方法。 This paper deals with the construction surveying of manufacture, installation, positioning and settlement of steel cofferdam of main towers foundation for a large cable bridge. It contains cofferdams bottom manufacture, installation, level transmition, precise positioning, sinking to the rock and finishing measure. This is aimed at providing an effective measuring method for such kind of cofferdam construction.
出处 《测绘工程》 CSCD 2000年第1期57-61,共5页 Engineering of Surveying and Mapping
关键词 钢围堰 桥梁 主塔基础 斜拉桥 施工测量 Steel cofferdam Bottom manufacture Precise positioning
  • 相关文献

参考文献4

  • 1铁道部大桥工程局桥梁科学研究所.斜拉桥[M].北京:科学技术文献出版社,1992..
  • 2章书寿 华锡生.工程测量学[M].北京:水利电力出版社,..
  • 3张正禄 吴栋材 等.精密工程测量[M].北京:测绘出版社,..
  • 4秦绲 李裕忠.桥梁工程测量[M].北京:测绘出版社,..

共引文献9

同被引文献10

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部