摘要
对大型斜拉桥主塔基础钢围堰的制作、拼装、定位及下沉的施工测量作了全面论述。包括大型双壁钢围堰的底节制作、拼装接高、基准面传递、精密定位着床、吸泥下沉至着岩、清基及竣工测量。旨在为大型斜拉桥建设提供可行的主塔基础钢围堰施测方法。
This paper deals with the construction surveying of manufacture, installation, positioning and settlement of steel cofferdam of main towers foundation for a large cable bridge. It contains cofferdams bottom manufacture, installation, level transmition, precise positioning, sinking to the rock and finishing measure. This is aimed at providing an effective measuring method for such kind of cofferdam construction.
出处
《测绘工程》
CSCD
2000年第1期57-61,共5页
Engineering of Surveying and Mapping