百色东合大桥索力分析及施工控制技术 被引量:3

Cable Tension Analysis and Construction Control Technology of Donghe Cable-Stayed Bridge in Baise City
原文传递
导出
摘要 斜拉桥属高次超静定结构,施工过程复杂,索力的施工控制与成桥状态具有相关性。索力的施工控制是将设计理论状态转变成实体受力的过程,是斜拉施工过程中最关键的控制技术之一,其主要目的是为了保证施工过程中结构的安全可靠,主桥线形合理、顺利合龙及成桥后结构内力合理。尤其是悬臂施工的斜拉桥,在施工过程中受到温度、收缩、徐变等因素的影响,使成桥后桥梁线形和内力的可调范围都比较小,因此需要对斜拉桥索力施工进行严格控制,以保证实现桥梁设计状态。以东合大桥为施工背景,浅谈斜拉桥索力分析及控制技术。 The cable-stayed bridge is a structure with high degrees of static indeterminacy, which con-struction process is complex. Construction control of cable tension has relations with the design objective. Construction control of cable tension is a process that made the bridge design theory into real stress objec-tive, which is one of the key technologies in cable-stayed construction process. The purpose of which is to ensure the safety and reliability of structure during construction, a desirable shape of the main girder, a smooth closure of the bridge and reasonable internal forces in the completed bridge. Especially the cable-stayed bridge constructed by cantilever casting, the construction is affected by various factors such as tem- perature change, shrinkage and creep, the adjustable range of the internal forces and bridge shape after closure is narrow. Therefore a rigorous control of the cable force by cable-stayed bridge construction is indispensable in order to guarantee the achievement of the design objective. Based on the Donghe Bridge in Baise City, the cable force and the control technology of cable-stayed bridge are discussed.
出处 《公路》 北大核心 2013年第5期20-24,共5页 Highway
关键词 斜拉桥 索力 施工控制 悬臂施工 技术 cable-stayed bridget cable tension construction control cantilever construction technology
  • 相关文献

参考文献5

  • 1广西交通规划勘察设计研究院.百色市东合大桥两阶段施工图设计[M].
  • 2JTG/TF50~2011公路桥涵施工技术规范[S].
  • 3GB50017-2003.钢结构设计规范[S].[S].,..
  • 4周水兴,何兆益,邹毅松.路桥施工计算手册[M].北京:人民交通出版社,2005.
  • 5交通部第一公路工程总公司.桥涵[M].北京:人民交通出版社,2000..