2FAIZ R B,SINGH S. Information analysis of rail track for pre-dictive maintenance [ J ]. Transactions on Ccmputers, 2009,8 (7) : 1123-1133.
3CARNERO M. An evaluation system of the setting up of pre- dictive maintenance programs[J]. Reliability Engineering and System Safety,2006,91 (8) :945-963.
4LINTON J. Preventive and predictive maintenance tools[J]. Cir-cuits Assembly,2006,17(10) : 14-16.
5BANSAL D,EVANS D J,JONES B. A reverse algorithm for the real-time predictive maintenance system[J]. International Journal of Machine Tools and Manufacture,2006,46(10):1068-1078.
6HUANG R,XI L,LEE J,et al. The framework,impact and com-mercial prospects of a new predictive maintenance system:intel- ligent maintenance system[J]. Production Planning and Control, 2005,16(7) :652-664.
7YANG S K. A condition-based preventive maintenance arrange- ment for thermal power plants[J]. Electric Power Systems Re- search, 2004,72 ( 1 ) : 49-62.
8BABU P,KALAYATHI S. Use of wavelet and neural network (BPFN) for transformer fault diagnosis [ C ]//2006 IEEE Con-ference on Electrical Insulation and Dielectric Phenomena. Kansas City, Missouri, USA : IEEE, 2006 : 93-96.
9LUCIFREDI A,MAZZIERI C,ROSSI M. Application of muhire-gressive linear models,dynamic kriging models and neural net-work models to predictive maintenance of hydroelectric power systems[J]. Mechanical Systems and Signal Processing,2000,14(3): 471-494.
10NIKRAZ M,CAIRE G,BAHRI P A. A methodology for the development of multi-Agent systems using the JADE platform [J]. Computer systems Science and Engineering,2006,21 (2): 99-116.