期刊文献+

宜良县海马箐水库导流、输水泄洪隧洞工程开挖中的问题及处理措施 被引量:1

The Water Problems during Excavation of Water-Supply and Spillway Tunnel and the Treatment Measures of Haimaqing Reservoir in Yiliang County
下载PDF
导出
摘要 本文以宜良县海马箐水库工程为例,阐述小洞径隧洞在开挖施工过程中遇到的不良地质、洞内地下水渗漏、塌方,超、欠挖等常见问题,提出解决方案:浅钻孔、多循环、弱爆破、强支护,以及"以排为主,防、截、堵相结合"的渗漏综合治理原则,对类似工程具有积极的借鉴作用。 Taking Haimaqing Reservoir in Yiliang County as an example, during small-diameter tunnel excava-tion process, unexpected problem were encountered, such as geological conditions, ground water seepage, col-lapse, overbreak or underbreak and other common problems. Solutions were proposed as below: shallow drilling, more circulation, weak blast, strong support. "The main thing is draining off water, also combining with water-proof and catch-drain" , the principle of comprehensive control of seepage, it can provides reference to similar projects.
出处 《贵州大学学报(自然科学版)》 2013年第2期104-107,122,共5页 Journal of Guizhou University:Natural Sciences
基金 省级应用基础研究计划基金项目资助(2011FZ203)
关键词 隧洞施工 开挖 问题 对策 tunnel construction excavation problem countermeasure
  • 相关文献

参考文献4

共引文献2

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部