针对峻发选煤厂扩建,对峻发选煤厂及峻立至峻发区间直流供电网络进行重新设计,并对架线网络供电能力进行了分析论证。
Aiming at the extension of Junfa Coal Preparation Plant, the paper introduced the redesigning of the direct current power supply network of Junfa Coal Preparation Plant and between Junli and Junfa interval, and then analyzed the power supply capacity of stringing network.
出处
《江西煤炭科技》
2013年第2期50-51,共2页
Jiangxi Coal Science & Technology
关键词
直流
接触网
轨道
阻值
direct current
catenary
track
resistance