期刊文献+

复杂环境下的斜井方案设计

The Design Scheme of Inclined Shaft in Complex Environment
下载PDF
导出
摘要 利用斜井作为施工通道成功解决了暗挖车站工作面少、出渣进料工效低、施工周期长等难题,但如何合理选址、避开重大风险、节约投资仍是暗挖车站斜井设计的一个关键性问题。以环线车站斜井方案设计为例,结合技术、经济、工期等因素综合分析,运用肯特指数法进行风险比较,并采用工程类比法对重大风险分析,研究复杂环境下的斜井方案设计,所得结论对类似工程有一定的参考价值及借鉴意义。 The inclined shaft as construction channel successfully resolved many problems in construction of underground station, just as the lack of excavation working face, the low efficiency of material transportation, the long construction period and so on. But how to site, to avoid risk and to save investment reasonably is still a key problem in design of underground station. This paper takes a certain inclined shaft design scheme as an example, evaluation method of Kent is applied in combination with technical, economic, construction period and other factors. The major risk is analyzing by the engineering analogy method, the construction design scheme in the complex environment is researching. All the obtained conclusions can be reference and guide to the urban tunnel.
作者 曹伟
出处 《铁道建筑技术》 2013年第4期1-3,12,共4页 Railway Construction Technology
关键词 斜井 方案设计 工程类比 风险分析 复杂环境 inclined shaft scheme design engineering analogy method risk analysis complex environment
  • 相关文献

参考文献6

二级参考文献16

  • 1先明其.隧道工程灾害事例调查报告[J].隧道译丛,1994(5):63-64. 被引量:1
  • 2GB50517-2003,地铁设计规范[S].
  • 3铁道部.铁路隧道设备劣化评定标准--隧道(T2820.2-1997)[S].北京:中国铁道出版社,1997.
  • 4郭仲伟.风险分析与决策[M].北京:机械工业出版社,1986..
  • 5周直. 大型工程项目实施阶段风险分析与管理研究[博士学位论文][D]. 上海:同济大学,1993.(Zhou Zhi. Risk analysis and management research on the large construction project in implementation period[Ph. D. Thesis][D]. Shanghai:Tongji University,China,1993.(in Chinese))
  • 6Heinz Duddeck. Challenges to tunnelling engineers[J]. Tunnelling and Underground Space Technology,1996,11(1):5-10.
  • 7沈国强. 影响建设项目经济效益的因素分析[硕士学位论文][D]. 上海:同济大学,1990.(Shen Guoqiang. Influential factor analysis on the economic benefit of construction project[M. S. Thesis][D]. Shanghai:Tongji University,1990.(in Chinese))
  • 8Stuzk R,Olsson L,Uohansson U. Risk and decision analysis for large underground projects,as applied to the stockholm ring road tunnels[J]. Tunnelling and Underground Space Technology,1996,11(2): 157-164.
  • 9Nilsen B,Palmstr?m A,Stille H. Quality Control of a Sub-sea Tunnel Project in Complex Ground Conditions[A]. In:Proc. of ITA World Tunnel Congress (99[C]. Oslo:[s. n.],1992. 137-145.
  • 10先明其.日本隧道工程的发展和灾害情况的统计[J].隧道及地下工程,1998,19(4):1-9. 被引量:12