悬索桥异型主塔模板翻模施工 被引量:2

Turnover Formwork Construction on Deformed Main Tower of Suspension Bridge
下载PDF
导出
摘要 某大桥工程设计为自锚式悬索桥,其主塔截面外轮廓是柱式主塔、四面凹槽,顶部4.5 m圆弧过渡变截面。通过对异型截面主塔的施工实践,从模板方案选择、模板设计、模板施工、施工控制措施方面进行了阐述。实践证明,该施工方案可行、可靠,并具有较好的经济性。 A bridge project is designed as self-anchored suspension bridge, with the cross section outline of the main tower is of column type, four-side groove, are transition cross section 4.5 m on the top. Through the construction practice of the main tower on the deformed cross section, detailed elaboration is made on formwork plan choice, formwork design, form- work construction, construction design measurement, etc. , which proves that the construction plan is feasible, reliable, and economically acceptable.
作者 畅里爱
出处 《铁道建筑技术》 2013年第4期116-119,共4页 Railway Construction Technology
关键词 悬索桥 主塔 异型模板 控制措施 suspension bridge main tower deformed formwork control measurement
  • 相关文献

参考文献2

二级参考文献4

共引文献5

同被引文献3

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部