期刊文献+

一台反应釜压料管管卡脱落、壁厚减薄原因分析及建议

Analysis and Suggestions on Pipe Strap Fallen off and Header Construction Local Wall-thinning of a Top Discharged Reaction Vessel
下载PDF
导出
摘要 介绍、分析了一台上出料反应釜在首次检验时发现的压料管管卡脱落、封头局部减薄等问题,提出了解决方案及设计意见,并建议设备使用单位缩短新设备投用后首次检查、检验的周期,以延长设备使用寿命。 Some problems including pipe strap fallen off and local wall-thinning on elliptical head of a top discharged reaction vessel was introduced and analyzed. Solutions and design suggestions were proposed. It was suggested that the first period of examination and inspection after the new device has been used should be shorten.
作者 杨以鹏
出处 《当代化工》 CAS 2013年第4期450-451,共2页 Contemporary Chemical Industry
关键词 反应釜 管卡 脱落 局部减薄 Reaction vessel Pipe strap Falling off Local wall-thinning
  • 相关文献

参考文献5

  • 1王勋,段轶,宋宇轩.浅谈压力容器的全生命周期管理[J].科技风,2012(15):261-261. 被引量:2
  • 2周永跟.论压力容器和压力管道的安全管理[C].2009中国金属学会冶金安全年会论文集,2009,11(4):253-256.
  • 3TSGR7001-2004.压力容器定期检验规则[S].[S].,..
  • 4TSG_R0004-2009固定式压力容器安全技术监察规程[S].
  • 5GBl50-2011,压力容器[S].

共引文献102

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部