遗传算法的关键链项目调度基准计划问题研究 被引量:1

The Benchmark Plan of Critical Chain Project Scheduling Based on the Genetic Algorithm
下载PDF
导出
摘要 关键链法是一种新的项目调度技术,近年已成为项目管理理论研究和实践的热点。本文面向大规模项目管理的应用需求,研究关键链项目调度的优化问题模型和求解算法,为关键链项目调度问题基准计划的产生设计一种遗传算法,并验证所提出算法的有效性。 As a new project scheduling technology, critical chain method has been a research focus in project management theory and practice. For the purpose of applying critical chain method in the large-scale projects, this paper studies the optimization models and their solutions for the critical chain project schedule. This paper studies the benchmark plan of the critical chain project scheduling problem and proposes a new genetic algorithm to solve this problem. And the effectiveness of this new genetic algorithm is verified by the simulation experiments and comparison.
出处 《沈阳理工大学学报》 CAS 2013年第2期43-47,52,共6页 Journal of Shenyang Ligong University
关键词 基准计划 关键链项目调度 遗传算法 项目管理 benchmark plan critical chain project scheduling genetic algorithm projectmanagement
  • 相关文献

参考文献6

  • 1彭武良,王成恩.关键链项目调度模型及遗传算法求解[J].系统工程学报,2010,25(1):123-131. 被引量:33
  • 2Bartusch M, M6hring R H, Radermacher F J. Schedu- ling Project Networks with Resource Constraints and Time Windows [ J ]. Annals of Operation Research, 1988,16:201 - 240.
  • 3Blazewicz J, Lenstra J K, Rinnooy Kan A H G. Schedu- ling Subject to Resource Constraints:Classification and Complexity [ J ]. Discrete Applied Mathematics, 1983, 5:11 -24.
  • 4Pate-Comell M E, Dillon R L. Success Factors and Fu- ture Challenges in the Management of Faster Better- cheaper Projects: Lessons Learned from NASA [ J ]. IEEE Transactions on Engineering Management, 2008, 48(1) :25 -35.
  • 5Wuliang Peng, Zhongliang Zhang, Zhaofu Tian. The Scheduling of Project Time, Cost and Product Quality. Proceeding of the 2010 Chinese Control and Decision Conference [ C]. Xuzhou,China,2010:150 - 155.
  • 6Hartmann S. Project Scheduling with Multiple Modes: A Genetic Algorithm [ J ]. Annals of Operations Re- search,2001 (102) : 111 - 135.

二级参考文献18

  • 1刘士新,宋健海,唐加福.基于关键链的资源受限项目调度新方法[J].自动化学报,2006,32(1):60-66. 被引量:63
  • 2刘士新,宋健海,唐加福.资源受限项目调度中缓冲区的设定方法[J].系统工程学报,2006,21(4):381-386. 被引量:70
  • 3Sakalauskas L,,Felinskas G.Optimization of resource constrained project schedules by genetic algorithm based on the jobpriority list. Information Technology and Control . 2006
  • 4Kolisch R,Sprecher A.PSPLIB—A project scheduling problem libray. European Journal of Operational Research . 1997
  • 5Goldratt EM.Critical Chain. . 1997
  • 6Graham K Rand.Critical chain: the theory of constraints applied to project management. International Journal of Project Management . 2000
  • 7Willy Herroelen,Roel Leus.On the merits and pitfalls of critical chain scheduling. Journal of Operator Theory . 2001
  • 8H. Steyn.Project management applications of the theory of constraints beyond critical chain scheduling. International Journal of Project Management . 2002
  • 9Chiu-Chi Wei,Ping-Hung Liu,Ying-Chin Tsai.Resource-constrained project management using enhanced theory of constraint. International Journal of Project Management . 2002
  • 10Zinovy D,Radovilsky.A quantitative approach to estimate the size of the time buffer in the theory of constraints. International Journal of Production Economics . 1998

共引文献32

同被引文献9

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部