大岗山水电站工程设备招标管理 被引量:1

Equipment bidding management of Dagangshan Hydropower Station
下载PDF
导出
摘要 大型水电站设备种类多样、技术参数复杂,其设备运行的可靠性直接关系到电站的安全性与稳定性,因此,提高大型水电站设备的招标采购水平意义重大。介绍了大岗山水电站建设阶段设备招标管理模式及方法,如编制实施性强的招标计划,优化招标条件、加强招标人员培训等。阐述了大岗山水电站设备招标过程中所取得的成效,并对同类工程设备招标管理提出相应建议。其经验可供同类工程借鉴。 Dagangshan Hydropower Station is equipped with various mechanical and electrical equipment that are technically complicated,and the reliability of equipment is directly related with the safety and reliability of the plant operation,therefore improving the level of purchasing and bidding of equipment has a significant meanings.We present the bidding management modes and methods during the construction period of Dagangshan Hydropower Station,including compiling bidding plan with high operability,optimizing bidding qualification,strengthening training of bidding staff.Moreover,we introduce the efforts obtained in the equipment biding process and propose some suggestions to the bidding management of similar projects.
作者 王辉 石庆雄
出处 《人民长江》 北大核心 2012年第22期26-29,共4页 Yangtze River
关键词 招标管理 设备招标 水电工程 大岗山水电站 biding management equipment biding hydropower projects Dagangshan Hydropower Station
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部