混凝土透水框架新型护岸定额研究

Study on the quota of new type of bank revetment built of concrete water-permeable frame
下载PDF
导出
摘要 依托南京三江口节点护岸加固工程,以施工中先进生产工艺为基础,通过对混凝土透水框架项目进行深入细致的现场研究,采用写实法提出混凝土透水框架预制生产定额及抛投定额两项确定性建议值,形成混凝土透水框架定额中最关键的两项要素,进一步完善了混凝土透水框架定额体系。 Relying on the bank revetment project of Nanjing Sanjiangkou joint and based on the advanced production process in the construction, through detailed site investigation of the concrete water permeable frame project, the suggested values for precasting production quota and casting quota of concrete permeable frame were proposed realistically, which formed the two key factors in concrete permeable frame quota, and the quota system of concrete permeable frame was further improved.
出处 《工程建设》 2013年第2期57-62,共6页 Engineering Construction
关键词 混凝土透水框架 新型护岸 定额 concrete water permeable frame new type of bank revetment quota
  • 相关文献

参考文献2

  • 1江苏省水利工程预算定额[s].南京:江苏人民出版社,2010.
  • 2水利工程施工机械台时费定额[s].郑州:黄河水利出版社,2002.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部