期刊文献+

火力发电厂主厂房采用单跨框排架结构抗震设计实例

Fossil-fired Power Plant's Main Building Using Single Span Frame Structure Seismic Design
下载PDF
导出
摘要 结合某火力发电厂主厂房结构设计,介绍主厂房采用单跨框排架结构设计的基本思路,分析了主厂房钢筋砼框排架结构抗震的薄弱环节。按照国家现行设计规范结合过去工程设计经验,分析并解决在设计和工程审查中遇到的常见问题。 Combination of a fossil-fired power plant's main building structure design, introduce the basic train of thought of the main building single span frame structure design, analysis of the main building of reinforced concrete frame structure of weak links in earthquake. According to the current national design code and the experience in engineering design analysis and solve in the design and engineering review of problems commonly encountered in.
出处 《工程建设与设计》 2013年第5期37-39,共3页 Construction & Design for Engineering
关键词 火力发电厂主厂房 钢筋混凝土框排架结构 抗震设计 fossil-fired power plant's main building reinforced concrete frame structures seismic design
  • 相关文献

参考文献6

  • 1GB50011-2010,建筑抗震设计规范[S].
  • 2GB50010--2010混凝土结构设计规范[S].
  • 3GB50009-2012,建筑结构荷载规范[S].
  • 4DL5022-2012,火力发电厂土建结构设计技术规程[S].
  • 5GB50260-96.电力设施抗震设计规范[S].[S].,..
  • 6GB50191-2012,构筑物抗震设计规范[S].