摘要 杭州湾跨海大桥主塔桩基础为大直径超长群桩基础,对全部38根桩进行了桩底后压浆,有效地提高了桩基承载力和整体刚度,减少了基础的不均匀沉降。重点介绍大规模群桩基础通过桩底压浆提高承载力的机理、压浆工艺及压浆效果。 Hangzhou Bay Bridge Main Pylon pile foundation for large diameter overlength pile group foundation, for all 38 piles of pile bottom post pressure grouting, and effectively improve the bearing capacity of pile foundation and the overall rigidity, reduces the nonuniform settlement of foundation.Focusing on mass group pile foundation by grouting pile to improve the bearing capacity of the mechanism, grouting technology and grouting effect.
作者 马成军
出处 《工程建设与设计》 2013年第5期87-89,共3页 Construction & Design for Engineering
关键词 杭州湾跨海大桥 群桩基础 桩底压浆 承栽力 机理 压浆工艺 效果 Hangzhou Bay Sea-crossing Bridge pile foundation pile bottom grouting bearing capacity mechanism grouting technology effect
  • 相关文献

参考文献3

二级参考文献14

共引文献121

同被引文献14

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部