摘要
针对桂城水厂三期工程加氯系统中存在的传输流量与流量计显示流量不一致 ,氯瓶切换时剩氯过多以及出厂水余氯不稳定的问题 ,提出了具体改进措施。
Some faults in the chlorination system of the 3rd phase construction of Guicheng waterworks are discussed, including the inexact readout between the Chlorine flow meter and the Chlorine transfer, the excess remain of displaced Chlorine container and the fluctuant free chlorine level in output water. Measures to improve the problems have been recommended.