摘要
本文以石家庄邮电专科学校实验大楼深基坑支护为例 ,介绍了在该深基坑中采用护坡桩、土钉、小护砂桩的综合支护技术 ,旨在说明各种支护措施的采用需根据实际的地质条件与具体工程情况来确定。
In this paper,living engineering example of deep pit's slope stabilization in shijiazhuang post college's laboratory building is presented.A skill of using steel concrete soldier piles、soil nailing and sand guard piles,for deep pit bracing is introduced.It shows in the selection of bracing technique the real geotechnical condition and specified engineering situation must be considered.
出处
《土工基础》
2000年第3期23-27,共5页
Soil Engineering and Foundation
关键词
深基坑
综合支护
护坡桩
土钉
deep pit,slope composite stabilization,soldier piles,soil nailing