摘要
在自升式海洋平台轮机系统设计中引进10 MPa高压喷冲系统,分析桩靴喷冲机理,对喷冲器进行调研,对喷冲管系进行合理化布置,将研究结果应用于新建50 m作业水深自升式海洋平台中,提高了喷冲效率,为拔桩作业提供了便利。
The 10 MPa high-pressure jetting system was drawn into the marine system of the jack-up platform. The mecha- nism of spud-can jetting system was analyzed to arrange the jetting pipe system rationally. The jetting system was used in the 50 m operating depth jack-up platform which can increase the jetting efficiency and make it convenient for extraction operation.
出处
《船海工程》
2013年第2期97-99,共3页
Ship & Ocean Engineering