中天山隧道TBM长距离施工通风方案研究 被引量:6

Case Study on Long-distance Ventilation of Zhongtianshan Tunnel Driven by TBM
下载PDF
导出
摘要 南疆吐库二线中天山隧道全长22.449 km,进口端采用TBM施工,计划施工长度13.8 km,长距离施工通风是影响施工进度和经济效益的重要因素。针对中天山隧道的施工方法、掘进长度、施工组织等实际情况,进行长距离施工通风方案研究,通过对比长距离独头通风方案和巷道式联合通风方案,确定巷道式联合通风方案为最优方案,并给出巷道式联合通风阶段的划分以及风机数量。通过现场测试通风方案实施情况,进一步调整通风方案,不断适应现场实际施工情况,为中天山隧道的安全顺利贯通提供了通风保障。 Zhongtianshan tunnel is 22. 449 km long. The 13.8 km entrance section of the tunnel is driven by TBM. Long-distance ventilation during tunneling is one of the important factors that affect the construction progress and eco-tance ventilation program and gallery-type combined ventilation program, which indicates that the gallery-type combined ventilation program is the optimum ventilation program. The stage division and number of the ventilation fans needed for the gallery-type combined ventilation program are proposed. The ventilation program is further adjusted during tunneling in accordance with the site ventilation monitoring results so as to meet the actual conditions of the site. In the end, the ventilation program adopted guarantees the successful breakthrough of Zhongianshan tunnel.
作者 朵生君
出处 《隧道建设》 2013年第5期419-422,共4页 Tunnel Construction
关键词 中天山隧道 TBM 长距离施工 巷道式联合通风 Zhongtianshan tunnel TBM long-distance driving gallery-type combined ventilation
  • 相关文献

参考文献11

二级参考文献42

共引文献137

同被引文献53

引证文献6

二级引证文献30

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部