摘要
2009年,我国汶川灾后对口支援实施以来,有关其长效化运作的问题受到学界关注。作为一种应急性对口支援机制,汶川灾后对口支援运作还存在启动动力不足、运行过程不稳、退出环节缺失等局限。援建期满后,汶川灾后对口支援须摆脱短期效应的困境,重新理清思路和调整布局,走符合应急性对口支援机制和未来发展趋势的区域合作之路。
Since the initiation of Wenchuan post-disaster partner assistance program in 2009, the problems in its long-term opera- tion have drawn the academic attention. As an emergency partner assistance mechanism, Wenchuan post-disaster partner assistance op- eration has some limitations, such as lack of the starting power, instability of the running process, and non-existence of the withdrawal procedure. When the program is completed, we need to get rid of the fallout of short-term effect, to clarify the thoughts and adjust the approaches, and progress towards the road of inter-regional cooperation, which conforms to the future trend of the partner assistance of emergency.
出处
《陕西行政学院学报》
2013年第2期63-67,共5页
Journal of Shaanxi Academy of Governance
关键词
应急性
对口支援
长效化
区域合作
emergency
partner assistance
long-term operation
regional cooperation