摘要
给出了由 G11UD变频器构成的电梯系统连接图并进行了运行时序分析 。
In this paper,the connection and wiring of the elevator control system based on the inverter G11UD is given,and the operation sequence of time is analysed.Besides,some key points and some difficult points for debugging the inverter G11UD are described to certain degree.$$$$
出处
《南京建筑工程学院学报》
2000年第3期49-54,共6页
Journal of Nanjing Architectural and Civil Engineering Institute(Natural Science)
关键词
变频器
电梯拖动系统
调试
the inverter
the elevator drive system
debugging