2T C Berends. Cost plus incentive fee contracting experiences and structuring [ J ]. International Journal of Project Management, 2000, 18 (3): 165-171.
7Xue Ai. Analysis and countermeasures of project cost control in construction enterprises [C]//2011 International Conference on E-Business and E-Government. Shanghai: ICEE, 2011.
8Vacharapoom Benjaoran. A cost control system development: A collaborative approach for small and medium-sized contractors [J]. International Journal of Project Management, 2009, 27 (3): 270-277.
9E A Stallworthy. Developments in project cost control [ J ] Engineering and Process Economics, 1979, 4 1 ) 29-36.
10W Richard Scott,黄洋,李霞,申薇,席侃译.组织理论[M].北京:华夏出版社,2002(12):213-214.
7Cawtbore-Ntgent M, Vieria J D L, Watson P A. An intelligent knowledge based system for cost estimating in the make-to-order environment [ J]. Computer Aided Engineering Journal, 1989, 6 (4): 121-127.
8Akintola Akintoye. Analysis of factors influencing project cost estimating practice [ J l. Construction Management and Economics, 2000, 18 (1): 77-89.
9Zoran data to versus traditional Vojislav Kecman. Modelling empirical project cost estimating: neural networks methods [ J . Construction Innovation: Information, Process, Management, 2001, 1 (4): 227-243.
10Wang Wei-chihg. Supporting project cost threshold decisions via a mathematical cost model [ J]. International Journal of Project Management 2004, 22 (2) : 99-108.