摘要
作者把定向对接采卤法划分为钻井施工和试采两个方面 ,并把钻井施工分为设计、井身结构、造斜、施工顺序四个内容 ,把试采分为连通期、扩大通道、生产期三个阶段进行了论述。
Author divvies the brine mining of the directional butted wells to drilling and trial mining, further the drilling includes design, well construction, slant drilling and construction and the trial mining includes connection period, shaft extending and operation.
出处
《中国井矿盐》
CAS
2000年第5期30-32,共3页
China Well and Rock Salt
关键词
试验过程
岩盐
定向对接钻井
采卤工艺
Slant drilling
Slanting tools
Well construction
Well group convection
Trial mining