摘要
对通让线通辽东至太平川段增建二线工程转线施工中出现的几个问题进行了简要分析,从建设管理角度和专业技术方面介绍了经验,为今后既有线增建二线工程转线施工提供经验。
This paper briefly analyzes a several problems occurring in the connection line construction in the Liaodong-Taipingchuan section of second-track-added project for the Tongrang line. Experiences are elaborated in view of construction management and specialist techniques, offering reference for later con- struetion engineering in addition of secondary tracks for existing lines.
出处
《铁道通信信号》
2013年第5期24-26,共3页
Railway Signalling & Communication
关键词
既有线
增建二线
方案
问题
Existing line
Addition of second tracks
Scheme
Problem