摘要
针对某站场改造时对列控中心试验的细节问题处理,提出正确的解决办法,以确保对既有线列控中心试验问题的处理细致、周密。
Aimed at accurate solution was thoroughly dealing with put forward the testing details to ensure that the of the train control test of train control center in transforming a station, centre will be dealt carefully and
出处
《铁道通信信号》
2013年第5期28-30,共3页
Railway Signalling & Communication
关键词
改造
施工
试验
Transform
Construction
Test