摘要
在湖南湘江大源渡电站建设过程中 ,水电七局、九局联营体与设计、监理、业主一道 ,根据工程实际 ,不断优化施工技术方案 ,大胆采用新技术、新工艺 ,保证了施工质量 ,加快了工程进度 ,取得了首台机组提前并网发电、整个工程提前竣工的成绩。
Dayuandu hydropower project is located on Xiangjiang River and is a key project of the State . During construction , joint venture of Chinese 7 th and 9 th Construction Bureau of Water Conservancy and Hydropower Engineering works together with the Designer , the Supervisor and the Owner . Based on actual project conditions , construction technique alternatives are continuously optimized .New techniques are boldly applied to ensure construction quality and accelerate project progress . The first unit is commissioned into operation ahead of time and the whole project is completed ahead of schedule .